Units times days, ending on a measured reading. The most checkable line on a water estimate, and the alternative to cutting material out. Equipment is billed per unit per day. The unit count comes from how much wet material there is and the day count comes from readings taken at marked points, compared against unaffected material in the same building. Both are countable in advance and verifiable afterwards, so this is the line on an estimate most worth asking to see broken out.
No obligation: the assessment comes before any scope
Every pro in our network is licensed and insured in Colorado.
Often needed alongside
- Emergency Water Extraction
The cheapest stage of a water loss, and the one that decides how expensive the rest of it gets. Standing water is removed before it moves into the structure.
- Ceiling Leak Damage Repair
The stain marks where water collected, not where it came in. The gap between the two is where a ceiling estimate's assumptions live.
Frequently asked questions
Why is the rebuild figure so much larger than the drying figure?
Because drying is priced by machines and days and rebuilding is priced by what was there. A below-grade room finished with built-in millwork and a specialist floor costs a great deal more to reinstate than the same area in builder-standard drywall and carpet, even though both dry at the same rate.
Can custom millwork be dried and kept?
Sometimes, and it is worth asking specifically. Solid timber cabinetry can often be dried in place or removed and dried; anything built on particleboard or MDF cannot, because those swell irreversibly. The answer decides a large part of the total, so ask which of the two is in the room.
What should be agreed before the rebuild starts?
What standard it is priced to. Reinstating a specialist finish and installing a builder-standard equivalent are different jobs at very different prices, and an estimate that does not say which it assumes cannot be compared. Agree the specification in writing before the work rather than at the end.